Data Centers

Copper, steel and fuel for data centers

An AI campus is a commodity buyer before it is a technology asset.  We source, finance and deliver the material it consumes, scheduled against the date the site can receive it.

The material underneath a megawatt

Electrical and power accounts for forty to forty five percent of what it costs to build a data center.  Underneath the switchgear and the busway sit refined copper, structural steel, aggregate and the fuel burned on site while a campus waits for the grid.

Refined Copper

Cable, Busway and Windings

Medium and high voltage cable, busway and transformer windings carry most of the copper.  Published intensity runs twenty to forty tonnes per megawatt built.

  • Medium and high voltage cable
  • Busway and bus duct
  • Transformer and switchgear windings
Structural Metals

Frame, Rebar and Decking

Structural steel, reinforcing bar and metal decking move in bulk, against a pour and erection sequence that runs across most of two years.

  • Structural steel sections
  • Reinforcing bar and mesh
  • Metal decking and racking
Natural Gas

Fuel for On-Site Generation

Campuses generating behind the meter burn gas for years ahead of energization.  That is a term supply relationship rather than a single delivery.

  • Pipeline gas and LNG
  • Term supply against generation
  • Scheduling and balancing
Aggregate and Distillate

Site Work and Standby Fuel

Aggregate, cement and sand move through the civil phase.  Distillate keeps standby sets and commissioning fills on schedule through the life of the asset.

  • Aggregate, cement and sand
  • Distillate for standby sets
  • Commissioning and top-up fills

What a campus consumes

Figures below are sized for a hundred megawatt campus.  Copper intensity is published.  The rest is derived from current construction benchmarks and stated operating assumptions, and every line is priced against the actual bill of materials before we quote it.

CommodityWhere it landsPer megawattPer campusBuying window
Refined copperCable, busway and windings20 to 40 tonnes2,000 to 4,000 tonnesMonth 6 to 30
Structural steelFrame, decking and racking90 to 150 tonnes9,000 to 15,000 tonnesMonth 8 to 24
Rebar and aggregateFoundations, slabs and yardsBulk, pour sequencedContinuous through civilsMonth 4 to 22
Natural gasOn-site generation before energizationRoughly 0.06 Bcf a yearRoughly 6 Bcf a yearTerm, from first fire
DistillateStandby sets and commissioningTank fills and top-upsRecurring through lifeMonth 20 onward

Copper intensity of twenty to forty tonnes per megawatt is published industry data.  Gas volume is derived at a heat rate of 8,500 Btu per kilowatt hour and an eighty percent capacity factor.  Steel and aggregate are derived from 2026 construction cost benchmarks.

The receiving window

Material is priced by the date it lands

A transformer that arrives early congests a laydown yard.  One that arrives late idles a commissioning crew.  We hold title and carry the position until the site can take delivery, then release it into the window the schedule actually supports.

Talk to the desk

How the desk serves a build

A developer or an EPC can buy material, credit and staging separately.  Bringing them to one counterparty is where the schedule holds.

Sourcing

Mill and Producer Access

Direct relationships with mills, rod producers, cable makers and gas marketers, so material is bought at origin rather than off a distributor shelf.

Trade Finance

Someone Carries the Position

Letters of credit, prepayment and borrowing base lines let long-lead material be ordered eighteen to twenty two months ahead without sitting on a developer balance sheet.

Delivery

Staged to the Schedule

Inventory held at a regional yard and released against crane windows, pour sequences and commissioning dates rather than a purchase order written years earlier.

Where this sits in the book

Digital infrastructure draws on corridors Elysium already runs.  The copper comes out of the metals book, the gas and distillate out of energy, and the documentation and credit work is the same discipline applied to a new end market.